2021-10-15

Wind Mast Measurement 80m

Description:

Mukachevo, October 2021

RES Techservice has been contracted for a turnkey solution for the installation of 80m wind measurement northeast from Mukachevo for the local wind farm developer. The scope of work included:

  • rental of the 80m met mast;
  • rental of the calibrated wind measurement;
  • all related works for the installation and commissioning of the met mast and equipment.

Project Name:

Wind Mast Measurement 80m

Service:

Wind Measurements

Location:

Ukraine, Zakarpatska oblast

Execution Period:

2022

Scope:

Rental of the 80m met mast and wind equipment, turnkey installattion works