One 120m Wind Mast Measurement in Dnipropertrivska oblast

Description:

Dnipro, August 2022

RES Techservice (RTS) has completed the installation of the met mast within the development of 150 MW wind farm in Central Ukraine. RTS’s scope of works includes:

  • supply of a 120m met mast;
  • supply of therespective wind measurement equipment;
  • project design and permit support for met mast erection;
  • turkey installation of the 120m met mast;
  • preliminary energy production assessment for the planned wind farm after 6 months of the wind measurement;
  • and final bankable energy production assessment for the planned wind farm after one year of the wind measurement.

 

Project Name:

One 120m Wind Mast Measurement in Dnipropertrivska oblast

Service:

Wind Measurements

Location:

Ukraine, Dnipropetrovska oblast

Execution Period:

2022

Scope: