2021-06-20

2 Wind Mast Measurements for 150MW wind farm

Description:

Odesa, June 2021

RES Techservice has executed the services related to two wind measurement northeast from Odesa for the local wind farm developer. The scope of work included:

  • installation works for  the two met masts of  100m and 120m;
  • supply and commissioning of the calibrated wind measurement equipment; and
  • wind measurement supervision with monthly reporting.

Project Name:

2 Wind Mast Measurements for 150MW wind farm

Service:

Wind Measurements

Location:

Ukraine, Odeska oblast

Execution Period:

2020-2021

Scope:

Turnkey mast supply and installation of two 120m met masts, energy production assessments