2022-01-15

Two 120m Wind Mast Measurements for 800MW wind farm in Ukraine

Description:

Mariupil, January 2022

RES Techservice (RTS) has completed the dismantling of the met mast, which has been previously installed within the development of 800MW in Southeastern Ukraine by Wind Farm LLC. Herewith RTS completes the project cooperation longing for 2.5 years, within RTS has:

  • supplied a 120m met mast;
  • supplied a respective wind measurement equipment; and
  • perfromed two independent installations and consequent dismantlings of the met mast.

The works have been performed in close cooperation with the Deutsche Wind Guard Consuting GmbH.

Project Name:

Two 120m Wind Mast Measurements for 800MW wind farm in Ukraine

Service:

Wind Measurements

Location:

Ukraine, Donetska oblast

Execution Period:

2019-2021

Scope:

Supply of 120m met mast and wind measurement equipment, two installations and dismantlings