RES Techservice has been contracted for installation services related to the installation of 120m wind measurement in the Southern part of Odeska oblast for the local wind farm developer. The scope of work included:
rehabilitation of the Client’s own 120m met mast;
re-calibration of the wind measurement equipment according to MEASNET guidelines; and
all related works for the installation and commissioning of the met mast and wind measurement equipment.
Project Name:
120m Wind Mast Measurement at Odeska Oblast
Service:
Wind Measurements
Location:
Ukraine, Odeska oblast
Execution Period:
2022
Scope:
Rental of the 120m met mast and wind equipment, turnkey installattion works