2024-05-31

120m Wind Mast Measurement at Vinnytska Oblast

Description:

Bar, Vinnytska oblast, May 2024,

RES Techservice has been contracted for supply and installation of 120m wind measurement mast and equipment in Vinnytska oblast for the local wind farm developer. The scope of work included:

  • supply to the Client 120m met mast and calibrated wind measurement equipment;
  • all related works for the installation and commissioning of the met mast and wind measurement equipment.

Project Name:

120m Wind Mast Measurement at Vinnytska Oblast

Service:

Wind Measurements

Location:

Ukraine, Vinnytska oblast

Execution Period:

2024

Scope:

Rental of the 120m met mast and wind equipment, turnkey installattion works