RES Techservice has been contracted for a turnkey solution for the installation of 120m wind measurement northeast from Varash for the local wind farm developer. The scope of work included:
rental of the 120m met mast;
rental of the calibrated wind measurement;
all related works for the installation and commissioning of the met mast and equipment.